Cost ranges by finish tier
Budget tiers should be defined by the selected materials, MEP scope, smart-home requirements, bespoke joinery, façade work, and FF&E. A project-specific bill of quantities is required before any reliable commercial figure can be confirmed.
What drives the price up in Riyadh specifically
Key cost drivers can include the approved design, authority requirements, glazing and insulation choices, imported-material lead times, site access, sequencing, and the level of documentation required by the project.
How to budget without surprises
Use a detailed BOQ-based quotation rather than relying on a general per-square-metre estimate. Itemize HVAC, electrical, fire, water, drainage, controls, finishes, and smart-room requirements, and agree how changes will be reviewed before execution.
Request a project-specific quotation review
Share the Riyadh project location, drawings, specifications, and required scope. DSCC will review the information before confirming whether a site visit is needed, the commercial basis of the proposal, and the expected quotation timeline.

