Scope definition: List the required structured cabling, access control, CCTV, intercom, audio-visual, public address, clock, Wi-Fi, monitoring, or other specified system functions
List the required structured cabling, access control, CCTV, intercom, audio-visual, public address, clock, Wi-Fi, monitoring, or other specified system functions. Start by recording this in a room or area schedule, with measurable quantities where they are available. Mark what is included, what remains a design decision, and which party supplies the information. This avoids treating a broad label as a complete deliverable and gives the design and procurement teams a common basis for comparison. The term low current does not define a single deliverable. Each system should have an owner, operational purpose, coverage criteria, network boundary, data responsibility, commissioning method, and documented acceptance basis.
Coordination information: Coordinate device locations with interiors, doors, ceilings, lighting, containment, equipment rooms, network architecture, normal or backup power, cooling, and fire stopping
Coordinate device locations with interiors, doors, ceilings, lighting, containment, equipment rooms, network architecture, normal or backup power, cooling, and fire stopping. Show the information on coordinated drawings rather than leaving it only in a narrative brief. Dimensions, access clearances, service points, ceiling zones, interfaces, and required approvals should be visible to the relevant disciplines. Early coordination can reveal unanswered questions before they affect ordering or installation sequencing.
Procurement review: Review device and point schedules, cable requirements, storage or licensing assumptions, integration protocols, user roles, labelling, test scripts, training, and as-built records
Review device and point schedules, cable requirements, storage or licensing assumptions, integration protocols, user roles, labelling, test scripts, training, and as-built records. For procurement, align the latest drawings, specification, schedule, quantities, and any material or equipment selections. Record alternatives and exclusions explicitly. A review can then distinguish confirmed requirements from assumptions, and can identify information still needed before availability, programme, or commercial terms are discussed.
Enquiry preparation: Share the system narratives, floor plans, IT and security criteria, approved products where specified, interface matrix, authority inputs, and acceptance responsibility
Share the system narratives, floor plans, IT and security criteria, approved products where specified, interface matrix, authority inputs, and acceptance responsibility. When submitting an enquiry, include the project location, current design issue, target dates, and the contacts responsible for technical decisions. Explain the desired outcome and any site constraints. DSCC can review the submitted project information; this page is not a commitment, price, availability statement, or representation of a local office.
Frequently asked questions
Which systems belong in a low-current enquiry for Riyadh?
List the required functions explicitly: structured cabling, CCTV, access control, intercom, audio-visual, public address, Wi-Fi or other specified systems. Attach device and point schedules, coverage requirements, floor plans, network criteria and approved product references where available. Identify existing systems and requested changes. The term low current is not a single fixed package; DSCC reviews each requested system before confirming scope, compatibility, availability or any delivery commitment.
What must be reviewed before integrating low-current systems?
Document each system's operational purpose, interface protocol, network boundary, user roles and data ownership. Include software licences, storage assumptions, cybersecurity responsibility, backup power and the supplier responsible for each connection. Check device locations against doors, ceilings, furniture and equipment rooms. Compatibility and integration are project-specific decisions; a list of devices alone does not establish that they work together or satisfy the project's acceptance criteria without testing.
What should a low-current testing and handover package contain?
Agree test scripts, labelling, point-to-point checks, functional tests, integrated scenarios and the party witnessing acceptance. Specify as-built drawings, device inventories, configuration records, operating instructions, authorised credential handover and training. Record unresolved findings and retest responsibilities. The required evidence depends on each system and the issued project specifications; this guidance does not promise a certification, unconditional approval or a standard test package suitable for every project.