SASCO Al-Jazeera 1 — LED Screens
Commercial

SASCO Al-Jazeera 1 — LED Screens

King Fahd Road — Riyadh–Al-Qassim Route (Saudi Arabia) • 2024
Client
Saudi Automotive Services Company (SASCO)
Location
King Fahd Road — Riyadh–Al-Qassim Route (Saudi Arabia)
Year
2024

Scope

Complete LED Screen Package & 14-Metre Roadside Digital Sign

Summary

As part of DSCC's delivery of LED screen projects across SASCO service stations, DSCC completed the full LED display package for Al-Jazeera 1 — including every LED screen inside the station and a landmark 14-metre roadside digital signage screen. Public reporting described Al-Jazeera 1 at launch as Saudi Arabia's largest fuel station, making the project a flagship digital-visibility installation within SASCO's network.

Approach

The installation brings together customer-facing screens across the station with the large-format roadside display, creating a consistent digital communication system from highway approach to the on-site service environment. DSCC handled the LED screen scope as an integrated package suited to a high-traffic, continuously operating destination.

Approach 2

SASCO is a Saudi public shareholding company established in 1982 and operates a broad network of automotive service stations and traveler facilities. Published information on Al-Jazeera 1 reports an investment of SAR 35 million and a site area of approximately 280,000 m² on the route linking Riyadh and Al-Qassim.

Highlights

  • Complete delivery of all LED screens inside Al-Jazeera 1
  • 14-metre large-format roadside digital signage screen
  • Part of DSCC's wider LED screen delivery across SASCO stations
  • Integrated on-site and roadside digital communication
  • Delivered for the flagship station in 2024

Solutions related to this project scope

Gallery

Image reuse is governed by the website terms. For permission enquiries, contact DSCC. Rights remain with their respective holders; permission is reviewed for each image individually.

Sarah estimated their project cost

from Riyadh · 9h ago